Factories, done right.

Ortho designs, builds and runs factories for manufacturers, from the first sketch to the ten-thousandth shift. We built its identity around the hand-drawn plan: a wordmark and mark, a grey system where black is kept for what needs attention, hand-drawn status dots, 144 icons and three levels of illustration, a website, and a product language for Plant OS and Foreman, the operator that never clocks out.

Client

Ortho

What it is

Factory design, build and operations

Year

2026

Services

The question

Ortho designs, builds and runs factories for manufacturers. It stays with a plant from the first sketch to the ten-thousandth shift. That is a lot of ground for one brand: a floor plan, a building site, a control room, a phone on the floor at night.

So we looked for the thing all of it shares. It was the drawing. Every plant starts as a plan drawn by hand, with an x and a y along its edges. We built the whole identity around that plan.

The idea

The mark is a small isometric box, drawn in a few quick strokes, next to a plain wordmark. On the loading screen, it sketches itself in, line by line. The tagline is short: Factories, done right.

The rest stays quiet so the drawings can speak. The palette is six greys, from paper to ink. Black is kept for what needs attention, like a Drift detected tag. Every other state carries a hand-drawn dot instead, one shape per state. Cards get no stroke, no radius, no shadow.

The drawings

Illustration comes in three levels. Simple is one object and a few strokes, like a gauge. Classic is a machine in its setting, like a truck at the dock. Complete is a whole plant, from a dimensioned floor plan to an isometric building with its chimney. Three brushes from the sketchbook do all of it.

The same hand drew 144 icons for the factory floor. They turn up on zone signs, on wayfinding for Line 03 and Dock 4, on stickers, and on packing tape that says Handle with care. Around them we made the everyday pieces, down to a stamp that says Approved for construction.

The product

Plant OS is five modules on one map of the plant, and it speaks the same language as the brand. A dashboard shows Line 03 running next to a live sketch of the line. A heat map sits on top of the hand-drawn floor plan.

Foreman is the operator that never clocks out. It watches every station and tells you what to do next, in short, plain sentences. Drift on Station 07, tool change at 13:40. Back in spec at 13:44. It writes the handover and the report at the end of the shift, and you choose which calls you want from it.

The website opens with one line: we draw, build and run factories. You can book a site visit and walk a running floor, and the 404 says This line is not on the plan. Most of it moves. Plans draw themselves and numbers write in by hand.

Two Ortho cards: stacked-plan drawing with Our principles tag, and a dimensioned corner sketch
Website hero about checking floor plans against simulated output, over a hand-drawn grid
Ortho Yield section on quality at line speed, a sketched conveyor with one part circled
Ortho banner with mark, wordmark, the tagline and a sketched truck at a loading dock
Ortho poster, Factories, done right, above a hand-drawn floor plan with x and y dimensions
Six hand-drawn icons labelled Operator, Station, Modules, Add line, Next shift and Ship
Plant OS cards: Line 03 running, Station 07 drift tag in black, daily output bar
Foreman notification flagging drift on Station 07, an Acknowledge button and a sketched phone in hand
Foreman chat screen: drift detected on Station 07, tool change at 13:40, Acknowledge button
Testimonial card design with a folded-plan drawing and a quote credited to a plant manager
Shift card with hand-drawn sun and moon icons for the day and night shift times
Product pieces side by side: Foreman panel, Line 03 line drawing and a Running status card
Ortho business cards with mark, tagline, a placeholder name and a dimensioned corner sketch
Foreman morning briefing with four items and hand-drawn icons above a black Start the shift button
Heat map over a hand-drawn floor plan, grey patches marking busy stations, High and Low toggles
Card reading Automation where it pays back, over a sketched robot arm at a workbench
Card reading Inventory that counts itself, above a hand-drawn storage rack with boxes
Make more. Waste less. card with four icons: scrap, water, green roofs, low-carbon steel
Built for every kind of line card with a sketched box and five industry tags
Wayfinding card with Line 03 and Dock 4 signs and hand-drawn arrows
Stickers card with six hand-drawn icons: factory, sparkle, pulse, gear, leaf and hook
Three grey energy cards with solar panel, wind turbine and battery icons
Plant OS search panel with six results, each with its own hand-drawn icon
Shift report for Line 03, written by Foreman, with hatched bar sketches and three figures
Foreman weekly report card written in plain sentences, with a black Open the report button
Foreman drift alert for Station 07, Acknowledge and View station buttons, a sketched phone
Quote card with a handwritten arrow and a placeholder COO byline, next to a folded-plan sketch
Six material icons on grey cards: steel coil, beams, bricks, barrels, silos and pipes
Crew patch design on grey: the Ortho mark above the words Halden crew
Machine card: sketched robot arm above reach, payload, cycle time and station figures
Careers section, Build the plants you'd want to work in, with four open roles
Plant review slide with the Ortho mark and an isometric sketch of a plant
Email signature in a grey frame: placeholder name, title and the Ortho mark
Business card front and back with mark, tagline, a sketched box and a placeholder name
Four zone signs for Safety, Logistics, Control room and Workshop, each with a hand-drawn icon
Field notes cover, number twelve, with a snaking line drawing and two article titles
Mobile case study page for a sample client, with an isometric plant sketch and project facts
Mobile booking step: pick a day to walk a plant floor, then name and email fields
Website section introducing Foreman beside three alert rows from Line 03
Foreman card in grey with three alerts: coil, a drifting station, back in spec
Simple illustration level: six one-object drawings, from a box and gauge to a cycle arrow
Classic illustration level: six machines in their setting, from a factory to a gantry crane
Status tags with hand-drawn dots, from Running to Beta, and Drift detected in black
Complete drawings one to six: floor plan, layers, section, line, robot cell and racks
Complete drawings seven to twelve, including a dashboard, a flow diagram and an isometric plant
Grey palette of six swatches, from white #FFFFFF through four greys to black #000000

Credits

Creative Direction

Drice Roland

Motion Design

Drice Roland

Website Design

Drice Roland

Next

Taste Labs · Brand API for AI agents